Assessment of Forest Road Damages

Client

Amprion

Country

Germany

Period

2011–2012

Project location·Germany

Background

In north-eastern Rhineland-Palatinate, existing 220-kV power lines were converted to 380-kv power lines. During this re-construction phase forest roads belonging to private forest owners had to be used. According to the law, damages to nature and the landscape have to be compensated through appropriate nature conservation measures. Amprion, a German electricity grid operator, requested UNIQUE to assess the condition of forest roads before and after construction vehicle use so as to ensure that necessary compensations could be made for damaged forest roads.

Our contribution

  • Development of an evaluation catalogue for forest roads (category and quality status).
  • Determination of the condition of the roads through site inspections.
  • Development of a cartographic overview of the roads used and their qualitative standard.
  • Consultation with forest owners and clients and a transparent presentation of procedures.
← All projects

Type to search

Ask by topic, country, client or method.

    Searches the full text of all references – in both languages. Show all projects